• 144 Malleable Iron Pipe Clamp Railing Side Support (Vertical)
  • 144 Malleable Iron Pipe Clamp Railing Side Support (Vertical)
  • 144 Malleable Iron Pipe Clamp Railing Side Support (Vertical)
  • 144 Malleable Iron Pipe Clamp Railing Side Support (Vertical)
  • 144 Malleable Iron Pipe Clamp Railing Side Support (Vertical)
  • 144 Malleable Iron Pipe Clamp Railing Side Support (Vertical)

144 Malleable Iron Pipe Clamp Railing Side Support (Vertical)

After-sales Service: Available
Warranty: 30-50 Years for H.D.G
Application: Decorations
Certification: CE, ISO
Surface Treatment: Yes
Technics: Forged
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
G144
Material
Steel
Type
Pipe Clamp
Surface
Hot DIP Galvanized(HDG)
Tensile Strength
>= 350MPa
Hardness
Hb<=150
Screw Material
Stainless Steel
Elongation
>= 10%
Transport Package
Box and Pallets
Specification
G144
Trademark
EA
Origin
China
HS Code
730890
Production Capacity
50000 Sets Per Month

Product Description

144 Malleable Iron Pipe Clamp Railing Side Support (Vertical)

PRODUCT DESCRIPTION
1. EATHU pipe clamp fittings are designed by using malleable iron in accordance with ASTM A197 which applies for good mechanical strength and enough elongation characters. The surface treatment of the kee clamp is hot-dipped galvanized which meets the specification of ASTM A153 for anti-rusting and corrosion.
144 Malleable Iron Pipe Clamp Railing Side Support (Vertical)
2. Six different sizes are available as follows.
144 Malleable Iron Pipe Clamp Railing Side Support (Vertical)

3. Three kinds of standard surface treatment can be provided on the key clamps, suitable for all kinds of indoor and outdoor applications.

144 Malleable Iron Pipe Clamp Railing Side Support (Vertical)

4. All our pipe joint connectors are with TUV, CE and ISO certificates.144 Malleable Iron Pipe Clamp Railing Side Support (Vertical)
PRODUCT PARAMETERS
Modular structures eliminate design and engineering costs, and on-site fabrication issues while reducing installation costs.
EATHU pipe fittings can be adapted or extended with additional components, or to be adjusted on-site.
144 Malleable Iron Pipe Clamp Railing Side Support (Vertical)
INSTALLATION INSTRUCTIONS
Designed for easy use, our key clamps are created for the modern construction environment. It combines the benefits of strength and durability without the need for specialized tradesmen, hot work permits, fire spotters and welding protection to finished surfaces.
144 Malleable Iron Pipe Clamp Railing Side Support (Vertical)
WHO IS EATHU
For over 16 years, EATHU has been a trusted name in piping solutions by offering high-quality products, services and support to the PVF industry continuously.
We provide expertise and product solutions for a wide range of applications, plumbing, mechanical, industrial, air-conditioning and refrigeration, mining, oil, gas, fire protection, equipment and power system.
We organize the whole production process in accordance with ISO 9001 and ISO 14001. It has also the most complete certificates in the PVF industry, including UL/FM of the US, CRN/cUL of Canada, DVGW/TUV/CE/VdS of Germany, BSI/LPCB of the UK, SII of Israel, JIS of Japan, ABNT of Brazil, GOST-R of Russia, CNBOP of Poland, KS of South Korea, TSE of Turkey, PSB of Singapore, SIRIM of Malaysia, SABS of South Africa etc.
144 Malleable Iron Pipe Clamp Railing Side Support (Vertical)

PACKING AND SHIPPING
Cartons and then plywood pallets are used into key clamp packages, suitable for sea or air export business which can be stacked in containers.
144 Malleable Iron Pipe Clamp Railing Side Support (Vertical)
FAQ

Q1. How can I get your prices of kee clamp?
A: Please provide your detailed inquiry list which includes items, surface requirements and estimated order quantity. Then a detailed quotation will be provided.

Q2. Can I have a sample before business starts?
A: Yes, we welcome sample orders to test and check our quality. Usually, samples are free and you just need to pay the courier cost by FedEx or DHL.

Q3. What about the lead time of the order?
A: Sample orders usually need 5-7 days after order confirmation. Mass production orders usually need 30-40 days after prepayment is received.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Registered Capital
1000000 RMB
Plant Area
501~1000 square meters